Page 8 - MY FLOOR 2022
P. 8

8

                                        An eye for detail and the big picture




                                        Conrad Huhn has been at SWISS KRONO TEX for 26 years and as Flooring Production Manager, he and
                                        his team ensure that production runs smoothly in the manufacture of MY FLOOR floors. He gave us
                                        a brief glimpse of his average day:





                                        As Production Manager, you must have a lot to      There’s a fairly broad range of different laminate
                                        coordinate and so much to keep an eye on.          flooring – MY FLOOR alone has 5 different
                                        What does this all consist of for you?             collections of varying lengths, thicknesses and
                                                                                           widths. How do you manage the many different
                                                                      2
                                        We produce between 170,000 m  and                  orders from all round the world?
                                        215,000 m  of floors every day; that’s an im-
                                                  2
                                        pressive quantity of ecologically sustainable      The available capacity required to supply our
                                        floors for healthy living. 7 floor production      customers has to be continuously coordinated
                                        systems alone have to be coordinated for the       with Sales. The major task is to find a cost-effective
                                        various products. Added to this, there is tool     balance between the needs of customers and
                                        management and tool technology. In addition,       the optimisation of processes. It’s a constant
                                        goods inwards and inventory management             challenge not to lose the necessary flexibility,
                                        for semi-finished and finished goods must of       and this keeps us on our toes. By optimising
                                        course be monitored. Our team consists of          processes, we were able in the last few years
                                        130 employees. As a result, everything is          to steadily boost the efficiency of the 7 floor
                                        very well coordinated.                             production systems.

                                                                                           Every one of our 7 floor production systems
                                                                                           has its specific technical characteristics – e.g.
                                                                                           specialising in entry level products up to 8 mm
                                                                                           or suitable for additional product finishing with
                                                                                           footfall sound insulation film, products with and
   3   4   5   6   7   8   9   10   11   12   13